0.5 min read

By SubTel Forum

Globe Telecom has fired up a new International Cable Landing Station in Nasugbu, Batangas which will be the site of the US$400 million Southeast Asia Japan Cable (SJC) System where Globe is the exclusive landing party in the Philippines  according to MB.com.  The 8,300-kilometer SJC linking Singapore, Hong Kong, Indonesia, Philippines, and Japan has the highest capacity system in the world. It uses wavelength transmission technology designed for 17 Terabits per second (Tbps) that could be upgraded to 23 Tbps. About 1.2 Tbps to 2 Tbps will be going through the Philippine branch.

Click here to read the article.

Published On: November 15, 2010
Mail Icon

news via inbox

Sign up to get the latest updates straight to your inbox!

Share This Story, Choose Your Platform!