ANCHORING SUCCESS: Choosing the Right Partner for Submarine Cable Projects BY KRISTIAN NIELSEN
KRISTIAN NIELSEN is based in the main office in Sterling, Virginia
Submarine cable systems are the unsung heroes of global connectivity, silently enabling seamless communication and data exchange across continents. These extensive projects, spanning vast oceanic distances, require precision, expertise, and strategic oversight at every stage to ensure efficiency, reliability, and long-term sustainability.
The success of any submarine cable project often comes down to one crucial factor—choosing the right client representation partner. A trusted partner does more than oversee operations; they serve as a guardian of the project’s integrity, ensuring that every phase aligns with technical specifications, contractual obligations, and client expectations.
Comprehensive Infield Support at Every Stage
Effective infield support can be the difference between a project delivered on schedule and costly delays. WFN Strategies provides comprehensive oversight across all critical phases of submarine cable projects:
1. Marine Survey Operations: Charting the Optimal Route
Before cable installation begins, an extensive marine survey is conducted to map the seabed and identify the most suitable route. This stage involves:
✔️ Verifying survey compliance with route specifications and analyzing data quality.
✔️ Identifying and mitigating underwater hazards such as rocky formations or environmentally sensitive areas.
✔️ Documenting findings in daily reports to ensure route accuracy and preempt potential issues.
2. Shore-End Installation: Establishing a Secure Connection
The shore-end phase ensures seamless integration between subsea cables and terrestrial networks. Key responsibilities include:
✔️ Monitoring HDD (Horizontal Directional Drilling) operations to ensure safe and stable cable landings.
✔️ Overseeing protective measures, such as jetting and pipeline reinforcements, to prevent structural damage.
✔️ Ensuring the installation of System Line Termination Equipment (SLTE) meets design and maintenance standards.
3. Marine Installation Activities: Deploying the Cable with Precision
Once surveys are completed and shore-end preparations are in place, the main installation phase begins:
✔️ Monitoring cable lay operations, ensuring adherence to technical specifications.
✔️ Performing real-time C-OTDR (Optical Time Domain Reflectometer) testing to evaluate cable performance.
✔️ Keeping detailed records of progress, delays, and corrective actions to maintain project timelines.
4. Post-Lay Inspection & Burial (PLIB): Ensuring Stability & Protection
After installation, a post-lay inspection is conducted to verify the cable's placement and burial depth. This includes:
✔️ Conducting ROV (Remotely Operated Vehicle) inspections to identify any exposed sections requiring remediation.
✔️ Reviewing adherence to the Route Position List (RPL) to ensure proper burial depths.
✔️ Delivering comprehensive reports with insights for optimizing long-term protection.
5. Commissioning & Acceptance: Validating System Readiness
The final phase ensures the system is fully operational through rigorous testing and certification:
✔️ Overseeing electrical, optical, and transmission validation tests to confirm performance.
✔️ Compiling detailed System Acceptance Reports to document findings and required adjustments.
✔️ Ensuring that all facilities, such as Cable Landing Stations (CLS), are fully integrated.
Why the Right Partner Matters
Beyond technical expertise, a trusted partner brings impartiality, transparency, and strategic problem-solving to every project. Their role goes beyond monitoring—they act as advocates for the client, ensuring that every decision prioritizes efficiency, compliance, and long-term project success.
Technology & Standards: Advancing Project Efficiency
The best partners leverage cutting-edge technologies such as:
🔹 Predictive modeling to foresee potential risks and optimize decision-making.
🔹 Live action tracking to monitor real-time metrics like burial depth and equipment performance.
🔹 ISO-certified processes (ISO 9001, ISO 14001, ISO 27001, and ISO 45001) to ensure compliance with global best practices.
WFN Strategies: A Proven Leader in Client Representation
At WFN Strategies, we are committed to delivering world-class Consulting and Client Representation services that drive success in submarine cable projects. Our team provides:
✅ Strategic consulting – Feasibility assessments, risk management, and regulatory compliance.
✅ End-to-end project oversight – Proactive monitoring across all critical phases.
✅ Advanced reporting tools – Real-time transparency to empower stakeholders.
Our vision is clear—to be the trusted partner for subsea consulting and client representation, ensuring every project is executed with precision, efficiency, and integrity.
In a world where global connectivity is vital, choosing a client representation partner with the right expertise, innovation, and reliability ensures not just project success but a stronger, more connected future.
📌 Read the full article to explore how WFN Strategies ensures excellence in submarine cable projects!

news via inbox
Nulla turp dis cursus. Integer liberos euismod pretium faucibua
editor's pick
- Tags: AI, infrastructure, Internet, Meta, submarine cable, telecoms, WaterworthPublished On: February 14, 2025
- Tags: acquisition, Infinera, Nokia, telecomsPublished On: March 3, 2025
- Tags: submarine cable, submarine cable almanac, SubTel Forum, telecomsPublished On: February 28, 2025